shoootin-photo-26 v2.jpg
 

WATERTOWN’S NEWEST PURPOSE-BUILT
lIFE sCIENCE pROJECT

GENESIS 250 Arsenal is Watertown’s premier purpose-built life science development, thoughtfully designed to meet the needs of emerging and scaling biotech companies across Greater Boston. Spanning 254,000 square feet across four efficient floors, the project offers flexible lab and office suites tailored for next-generation research and discovery.

Completed in 2024, the building features state-of-the-art infrastructure, dynamic common areas, and curated onsite amenities that support both productivity and collaboration. Here, tenants are part of a vibrant ecosystem—positioned to connect, grow, and lead breakthroughs within the region’s most exciting life science corridor.

Elevate your science in a space built to inspire.

Premier Spec Suites - Available Now

 

±254,000 SF

2024 New Construction - Purpose Built

Efficient Floor Plates Up to ±71,000 SF

Robust MEP Systems Accommodate Laboratory Standards

AMENITIES

On-Site Restaurant and Cafe

±3,600 SF Fitness Center

Communal Fire Pits & MORE

DELIVERY

Available Now

Built to LEED Silver Standard

Pre-designed Lab & Lab Support Features Throughout

Click the thumbnail images below to view larger.

 

 

shoootin-photo-3 v2.jpg
 

PREMIER LOCATION AND AMENITIES

Access Watertown’s Life Science Corridor - with Ease

Genesis is situated in the bustling East End of Watertown’s renowned life science corridor. This highly coveted and iconic location offers unparalleled access for tenants to effortlessly recruit top-tier talent, convenient proximity to local retail outlets, and seamless connectivity to public transportation networks.

 


Boston Logan Airport

25 Min | 12.2 Miles

Back Bay Station

15 Min | 6.8 Miles

Exit 127 [Off I-90]

13 Min | 2.5 Miles

Exit 131 [Off I-90]

7 Min | 2 Miles

 

shoootin-photo-23.jpg

 

FIVE COMPONENTS - endless options

Every GENESIS suite is equipped with an industry standard, modular benching system. This system minimizes downtime and maximizes flexibility. The 5-component system is pre-plumbed and pre-wired for fast installation and effortless reconfiguration. Add components and rearrange overnight.

 

 
 
Icon_3_.png

Adjustable Height Work Surfaces

Adaptable to almost any work environment and constructed with a welded metal frame to provide stability to the most
sensitive instruments.

Icon_3_2.png

Mobile
Cabinets

Combine any number of
cabinets to customize storage.

Icon_3_3.png

Flexible Shelving Units

Bolts to any adjustable height table to offer 2 or 3 levels of shelving. Half-length units also available.

Icon_3_4.png

Service Unit

The core component, designed to accommodate up to 7 lab gasses and 12 electrical circuits per unit.

Icon_3_5.png

Fume Hoods

Each suite is capable of accommodating various sized fume hoods ranging from 4 to 8 feet.

 

Click the thumbnail images below to view larger.

shoootin-photo-2.jpg

For Leasing and Project Information


Mark Winters
Vice Chairman
Life Science Practice
NEWMARK
617-905-6750
mark.winters@nmrk.com

David Townsend
Executive Managing Director
NEWMARK
617-388-8363
david.townsend@nmrk.com

Juliette Reiter
Executive Managing Director
NEWMARK
617-797-3038
juliette.reiter@nmrk.com


Catie Duffy
Director
NEWMARK
303-868-9111
catie.tilton@nmrk.com

Morgan Weinstein
EVP
Phase3 Real Estate Partners
617-217-8226
weinstein@p3re.com